Title | Date | Type | Year |
---|---|---|---|
AER Letter to Jemena re Exemption Application - Colongra | 2017-12-01 | Part 23 decision | 2017 |
Colongra Overview map | 2017-12-01 | Pipeline description | 2017 |
The Colongra Gas Transmission and Storage Pipeline is a transmission pipeline on the central coast of NSW. The pipeline is owned by Jemena Colongra Pty Ltd.
The Colongra Gas Transmission and Storage Pipeline is 9 km in length and has a capacity of 41 TJ/day. It delivers gas to Snowy Hydro Limited's 667MW gas turbine facility near Lake Munmorah and, by being a double looped 42 inch pipeline, can store enough gas to enable the power station to run at full capacity for five hours.
Construction of the Colongra Gas Transmission and Storage Pipeline was completed in 2009.
The Colongra Gas Transmission and Storage Pipeline is currently a non-scheme pipeline, and is subject to the access regime for non-scheme pipelines under Chapter 6A of the NGL and Part 23 of the NGR. On 1 December 2017, the AER granted a 5 year category 1 and category 2 exemption under Part 23 of the NGR.
Title | Date | Type | Year |
---|---|---|---|
AER Letter to Jemena re Exemption Application - Colongra | 2017-12-01 | Part 23 decision | 2017 |
Colongra Overview map | 2017-12-01 | Pipeline description | 2017 |