Title | Date | Type | Year |
---|---|---|---|
Bullsbrook Lateral Pipeline - Map | |||
Exemption Application – Bullsbrook (Rocla Quarries) Lateral Pipeline (PL46) | 2018-05-08 | 2018 |
Bullsbrook Lateral Pipeline is a distribution pipeline located in South-West, WA.
The lateral was built in 2000. It is a 4" (11cm) diameter pipeline that is 0.2km long. Its operating pressure is 7.48Mpa MAOP. The Bullsbrook Pipeline is currently a non-scheme pipeline, and is subject to the access regime for non-scheme pipelines under Chapter 6A of the NGL and Part 23 of the NGR. On 8 May 2018, the ERAWA granted a five-year Category 2 exemption under Part 23 of the NGR for the Bullsbrook Lateral Pipeline.
Title | Date | Type | Year |
---|---|---|---|
Bullsbrook Lateral Pipeline - Map | |||
Exemption Application – Bullsbrook (Rocla Quarries) Lateral Pipeline (PL46) | 2018-05-08 | 2018 |