The Cheepie to Barcaldine Gas Pipeline (CBGP) is a transmission pipeline owned by Ergon Energy and operated by OSD Pipelines.
The CBGP is 404km in length. The Cheepie to Gilmore portion has a daily capacity of 3 TJ, while the Gilmore to Barcaldine portion has a daily capacity of 12 TJ.
The CBGP transports gas to Ergon Energy’s Barcaldine gas fired power station from the South West Queensland Pipeline (SWQP) at Cheepie.
The CBGP is currently a non-scheme pipeline, and is subject to the access regime for non-scheme pipelines under Chapter 6A of the NGL and Part 23 of the NGR.
The CBGP was constructed in two stages. The first stage was completed in 1995 and connected the Gilmore gas field in the Adavale basin in south-central Queensland to the Barcaldine power station. In 2003, following the depletion of the Gilmore gas field, the pipeline was extended further south to connect with the SWQP at Cheepie, thereby securing gas supply for the Barcaldine power station.
Title | Date | Type | Year |
---|---|---|---|
Cheepie to Barcaldine Gas Pipeline Description | Pipeline description | ||
Part 23 exemption - Cheepie to Barcaldine Gas Pipeline | 2018-06-26 | 2018 | |
Cheepie to Barcaldine Gas Pipeline - Map |