Title
|
Proponent(s)
|
Determination
|
Amending
Rule
|
Amended
chapters
|
Commenced
|
Rule
version
|
AEMC
reference
|
|
Minor Rule Change 2013 |
AEMC |
30-May-13 |
2013 No. 3 |
|
4-Jul-13 |
|
ERC0155 |
|
Potential Generator Market Power in the NEM |
Major Energy Users Inc. |
26-Apr-13 |
|
|
Rule Not Made |
|
ERC0123 |
|
Changes to normal voltage |
GDF Suez (formerly International Power) |
28-Feb-13 |
2013 No. 2 |
5
|
7-Mar-13 |
55 |
ERC0148 |
|
Inter-regional Transmission Charging |
MCE |
28-Feb-13 |
2013 No. 1 |
6A
|
1-Jul-15 |
|
ERC0106 |
|
Economic Regulation of Network Service Providers |
AER and EURCC |
29-Nov-12 |
2012 No. 9 |
5, 6, 6A, 10, 11
|
29-Nov-12 |
53 |
ERC0134 |
|
Calculation of Return on Debt for Electricity Network Businesses |
Energy Users Rule Change Committee |
29-Nov-12 |
2012 No. 9 |
6, 6A, 10, 11
|
29-Nov-12 |
53 |
ERC0135 |
|
Small Generation Aggregator Framework |
Australian Energy Market Operator |
29-Nov-12 |
2012 No. 8 |
2, 3, 5A, 7, 8, 10, 11
|
1-Jan-13 |
54 |
ERC0141 |
|
Distribution Losses in Expenditure Forecasts |
The Copper Development Centre |
18-Oct-12 |
2012 No. 7 |
S5.8
|
1-Jan-13 |
54 |
ERC0142 |
|
New Prudential Standard and Framework in the NEM |
Australian Energy Market Operator |
18-Oct-12 |
2012 No. 6 |
3
|
1-Nov-12 |
52 |
ERC0133 |
|
Distribution Network Planning and Expansion Framework |
MCE |
11-Oct-12 |
2012 No. 5 |
5, 6, 10, 11
|
1-Jan-13 |
54 |
ERC0131 |
|
Assumed utilisation of imputation credits |
SP Ausnet and Electranet |
20-Sep-12 |
|
|
Rule Not Made |
|
ERC0143 |
|
Optimisation of Regulatory Asset Base and Use of Fully Depreciated Assets |
Major Energy Users Inc. |
13-Sep-12 |
|
|
Rule Not Made |
|
ERC0136 |
|
Cost pass through arrangements for network service providers |
Grid Australia |
2-Aug-12 |
2012 No. 4 |
6, 6A, 10, 11
|
2-Aug-12 |
51 |
ERC0137 |
|
Minor Changes 2012 |
AEMC |
14-Jun-12 |
2012 No. 3 |
3, 5, 6, 6A, 7, 9, 11
|
Sch1: 26-Jul- 2012 / Sch 2: 1-Jul-2016 |
51 |
ERC0146 |
|
Negative intra-regional settlements residue |
AEMO |
22-Mar-12 |
2012 No. 2 |
3, 10, 11
|
5-Apr-12 |
49 |
ERC0139 |
|
Expiry of the Reliability and Emergency Reserve Trader |
Reliability Panel |
15-Mar-12 |
2012 No. 1 |
3, 4, 10, 11
|
15-Mar-12 1 July 2016 |
48 |
ERC0132 |
|
Definition of Temporary Over-Voltage Limits |
Hydro Tasmania |
19-Jan-12 |
|
|
Rule Not Made |
|
ERC0120 |
|
Total Factor Productivity for Distribution Network Regulation |
Minister for Energy and Resources (Victoria) |
22-Dec-11 |
|
|
Rule Not Made |
|
ERC0068 |
|
Network Support Payments and Avoided TUoS for Embedded Generators |
MCE |
22-Dec-11 |
2011 No. 12 |
5
|
22-Dec-11 |
47 |
ERC0129 |
|
Inclusion of Embedded Generation Research into Demand Management Incentive Scheme |
MCE |
22-Dec-11 |
2011 No. 11 |
6
|
22-Dec-11 |
47 |
ERC0128 |
|
Efficiency Benefit Sharing Scheme and Demand Management Expenditure by Transmission Businesses |
MCE |
22-Dec-11 |
2011 No. 10 |
6
|
22-Dec-11 |
47 |
ERC0127 |
|
Application and operation of Administered Price Periods |
Australian Energy Market Operator |
10-Nov-11 |
2011 No. 9 |
3, 11
|
10-Nov-11 2-Jul-2012 |
46 |
ERC0121 |
|
Tasmania Tranche 5a Procedure Changes |
Tasmanian Government |
14-Jul-11 |
2011 No. 8 |
11
|
14-Jul-11 |
45 |
ERC0130 |
|
Scale Efficient Network Extensions |
MCE |
30-Jun-11 |
2011 No. 7 |
5
|
1-Jul-11 |
44 |
ERC0100 |
|
Application of Dual Marginal Loss Factors |
Australian Energy Market Operator |
29-Jun-11 |
2011 No. 6 |
2, 3
|
30-Jun-11 |
44 |
ERC0117 |
|
Reliability Settings from 1 July 2012 |
Reliability Panel |
16-Jun-11 |
2011 No. 5 |
3
|
1-Jul-11 |
44 |
ERC0115 |
|
Minor Changes 2011 - Electricity |
AEMC |
16-Jun-11 |
2011 No. 4 |
8A, 3, 5, 6A, 7, 9, 10
|
1-Jul-11 |
44 |
ERC0124 |
|
Business day definition |
AEMO |
21-Apr-11 |
2011 No. 3 |
10
|
21-Apr-11 |
43 |
ERC0122 |
|
Network Support and Control Ancillary Services |
Australian Energy Market Operator |
7-Apr-11 |
2011 No. 2 |
2, 3, 4, 5, 8, 10, 11
|
5-Apr-12 |
42 |
ERC0108 |
|
DNSP recovery of transmission-related charges |
United Energy Distribution |
24-Mar-11 |
2011 No. 1 |
6, 10, 11
|
24-Mar-11 |
42 |
ERC0114 |
|
Release of Generator information by AEMO |
Senergy Econnect Australia Pty Ltd |
23-Dec-10 |
2010 No. 14 |
3, 5, 10
|
20-Jan-11 |
41 |
ERC0112 |
|
Amendments to PASA-related Rules |
Australian Energy Market Operator |
2-Dec-10 |
2010 No. 13 |
3, 4, 10, 11
|
16-Dec-10 |
40 |
ERC0107 |
|
Provision of Metering Data Services and Clarification of Existing Metrology Requirements |
Australian Energy Market Operator |
25-Nov-10 |
2010 No. 12 |
3, 5, 6, 7, 8, 9, 10, 11
|
16-Dec-10 20-Jan-11 |
40 |
ERC0092 |
|
Aggregation of Ancillary Services Loads |
Australian Energy Market Operator |
9-Sep-10 |
2010 No. 11 |
3
|
16-Sep-10 |
39 |
ERC0104 |
|
Victoria Generator Technical Performance Standards Derogations |
Minister for Energy and Resources (Victoria) |
9-Sep-10 |
2010 No. 10 |
9
|
16-Sep-10 |
39 |
ERC0102 |
|
Timing for spot price reporting |
AER |
22-Jul-10 |
2010 No. 9 |
3
|
22-Jul-10 |
38 |
ERC0111 |
|
Publication of a Carbon Dioxide Equivalent Intensity Index for the National Electricity Market |
Australian Energy Market Operator |
22-Jul-10 |
2010 No. 8 |
3
|
22-Jul-10 |
38 |
ERC0098 |
|
Payments under Feed-in Schemes and Climate Change Funds |
ETSA Utilities |
1-Jul-10 |
2010 No. 7 |
6, 11
|
1-Jul-10 |
38 |
ERC0097 |
|
Minor Changes 2010 |
AEMC |
3-Jun-10 |
2010 No. 6 |
1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11
|
|
40 |
ERC0105 |
|
Cost Recovery for Other Services Directions |
Australian Energy Market Operator |
13-May-10 |
2010 No. 5 |
3
|
1-Jul-11 |
54 |
ERC0090 |
|
Transparency of Operating Data |
Australian Energy Market Operator |
11-May-10 |
2010 No. 4 |
3, 11
|
13-May-10 |
35 |
ERC0096 |
|
SA Jurisdictional Derogation (Connections Charging) |
South Australian Minister for Energy |
6-May-10 |
2010 No. 3 |
9
|
1-Jul-10 |
38 |
ERC0101 |
|
Timing for intervention compensation determinations |
Australian Energy Market Operator |
25-Mar-10 |
2010 No. 2 |
3
|
25-Mar-10 |
35 |
ERC0099 |
|
Early Implementation of Market Impact Parameters |
Grid Australia |
11-Mar-10 |
2010 No. 1 |
11
|
12-Mar-10 |
34 |
ERC0093 |
|
Bid and Offer Validation Data |
Australian Energy Market Operator |
3-Dec-09 |
2009 No. 21 |
3, 5, 10
|
16-Dec-10 |
40 |
ERC0091 |
|
Confidentiality Provisions for Network Connections |
Grid Australia |
12-Nov-09 |
2009 No. 20 |
5
|
12-Nov-09 |
33 |
ERC0089 |
|
Improved RERT Flexibility and Short-notice Reserve Contracts |
Reliability Panel |
15-Oct-09 |
2009 No. 19 |
3, 11
|
15-Oct-09 |
32 |
ERC0094 |
|
Causer Pays for Ancillary Services to Control the Tasmanian frequency |
Hydro Tasmania |
15-Oct-09 |
|
|
Rule Not Made |
|
ERC0082 |
|
Arrangements for Managing Risks Associated with Transmission Network Congestion - Rule 18 |
MCE |
13-Aug-09 |
2009 No. 18 |
3, 10, 11
|
1-Sep-09 |
31 |
ERC0076 |
|
Arrangements for Managing Risks Associated with Transmission Network Congestion - Rule 17 |
MCE |
13-Aug-09 |
2009 No. 17 |
3, 10, 11
|
1-Jul-10 |
38 |
ERC0076 |
|
Arrangements for Managing Risks Associated with Transmission Network Congestion - Rule 16 |
MCE |
13-Aug-09 |
2009 No. 16 |
3, 10, 11
|
1-Sep-09 |
31 |
ERC0076 |
|
Regulatory Investment Test for Transmission |
MCE |
25-Jun-09 |
2009 No. 15 |
5, 8, 10, 11
|
1-Jul-09 |
30 |
ERC0077 |
|
EnergyAustralia Participant Derogation Extension (Settlement Residue Auctions) |
EnergyAustralia |
11-Jun-09 |
2009 No. 14 |
|
1-Jul-09 |
30 |
ERC0088 |
|
Contingency Administered Price Cap Following a Physical Trigger Event |
NGF |
4-Jun-09 |
|
|
Rule Not Made |
|
ERC0075 |
|
NEM Reliability Settings: VoLL, CPT and Future Reliability Review |
Reliability Panel |
28-May-09 |
2009 No. 13 |
3, 10
|
28-May-09 |
29 |
ERC0080 |
|
AETV Participant Derogation to Allow Commissioning of a New Power Station |
Aurora Energy (Tamar Valley) Pty Ltd |
28-May-09 |
2009 No. 12 |
|
28-May-09 |
29 |
ERC0087 |
|
Demand Management |
TEC |
23-Apr-09 |
2009 No. 11 |
5
|
1-Jul-09 |
30 |
ERC0047 |
|
Futures Offset Arrangements |
Australian Power & Gas, Infratil Energy Australia, Momentum Energy |
16-Apr-09 |
|
|
Rule Not Made |
|
ERC0056 |
|
Negative Settlements Residue Recovery, Extension of Sunset |
NEMMCO |
16-Apr-09 |
2009 No. 10 |
3, 11
|
16-Apr-09 |
28 |
ERC0079 |
|
National Transmission Statement |
MCE |
2-Apr-09 |
2009 No. 9 |
11
|
16-Apr-09 |
28 |
ERC0078 |
|
Transmission Network Prices Publication Date |
EnergyAustralia |
26-Mar-09 |
2009 No. 8 |
|
31-Mar-09 |
27 |
ERC0069 |
|
Minor Changes 2009 |
AEMC |
26-Mar-09 |
2009 No. 7 |
5, 6, 7, 8, 11
|
31-Mar-09 |
27 |
ERC0085 |
|
WACC Reviews - Extension of Time |
AER |
26-Mar-09 |
2009 No. 6 |
6, 11
|
31-Mar-09 |
27 |
ERC0083 |
|
Removal of Performance Standard for Identifying Manifestly Incorrect Inputs |
NEMMCO |
26-Feb-09 |
2009 No. 5 |
3
|
27-Feb-09 |
26 |
ERC0081 |
|
Confidentiality Arrangements in Respect of Information Required for Power System Studies |
NGF |
19-Feb-09 |
2009 No. 4 |
3, 5, 8, 10, 11
|
27-Feb-09 |
26 |
ERC0062 |
|
Cost Allocation Arrangements for Transmission Services |
NGF |
29-Jan-09 |
2009 No. 3 |
11
|
13-Feb-09 |
25 |
ERC0057 |
|
Victorian Jurisdictional Derogation (Advanced Metering Infrastructure Roll Out) |
Minister for Energy and Resources (Victoria) |
29-Jan-09 |
2009 No. 2 |
9
|
1-Jul-09 |
30 |
ERC0053 |
|
Ramp Rates, Market Ancillary Service Offers, and Dispatch Inflexibility |
AER |
16-Jan-09 |
2009 No. 1 |
3, 10
|
31-Mar-09 |
27 |
ERC0065 |
|
Compensation Arrangements Under Administered Pricing |
EnergyAustralia |
18-Dec-08 |
2008 No. 17 |
3, 11
|
1-Jan-09 |
24 |
ERC0051 |
|
Queensland Generator Technical Performance Standards Derogations |
Queensland Government |
11-Dec-08 |
2008 No. 16 |
9
|
1-Jan-09 |
24 |
ERC0070 |
|
Registration changes for Traders, Reallocators, and Transfer of Registration |
NEMMCO |
4-Dec-08 |
2008 No. 15 |
2, 3
|
1-Jan-09 |
24 |
ERC0071 |
|
Preservation of Prudential Margin Through Call Notices |
NEMMCO |
27-Nov-08 |
2008 No. 14 |
3
|
1-Jan-09 |
24 |
ERC0073 |
|
Clarification of Market Information Requirements for Market Ancillary Services |
NEMMCO |
27-Nov-08 |
2008 No. 13 |
3
|
1-Jan-09 |
24 |
ERC0074 |
|
Easement Land Tax Pass Through |
SP Ausnet |
27-Nov-08 |
2008 No. 11 |
11
|
1-Jan-09 |
24 |
ERC0072 |
|
Setting VoLL Following the Shedding of Interruptible Load |
AER |
20-Nov-08 |
2008 No. 12 |
3
|
20-Nov-08 |
23 |
ERC0061 |
|
Parameter Values, Equity Beta and Gamma |
EUAA |
13-Nov-08 |
|
|
Rule Not Made |
|
ERC0063 |
|
Performance Standard Compliance of Generators |
NGF |
23-Oct-08 |
2008 No. 10 |
4, 5, 8, 10, 11
|
23-Oct-08 |
22 |
ERC0058 |
|
Regulatory Test Thresholds and Information Disclosure on Network Replacements |
ETNOF |
23-Oct-08 |
2008 No. 9 |
5, 9, 10, 11
|
23-Oct-08 |
22 |
ERC0052 |
|
Reclassification of Contingency Events |
AER |
2-Oct-08 |
2008 No. 8 |
4, 9, 10
|
23-Oct-08 |
22 |
ERC0060 |
|
Minor Change to Technical Requirement for Generators |
NEMMCO |
7-Aug-08 |
2008 No. 7 |
5
|
23-Oct-08 |
22 |
ERC0067 |
|
NEM Reliability Settings: Information, Safety Net and Directions |
Reliability Panel |
26-Jun-08 |
2008 No. 6 |
1, 3, 4, 5, 10, 11
|
1-Jul-08 |
21 |
ERC0059 |
|
WACC Parameters – Technical Drafting Issues |
AER |
26-Jun-08 |
2008 No. 5 |
|
1-Jul-08 |
21 |
ERC0066 |
|
WACC - Alignment of Reviews |
AER |
26-Jun-08 |
2008 No. 4 |
|
1-Jul-08 |
21 |
ERC0064 |
|
Economic Regulation of Transmission Services Undertaken by Distributors |
EnergyAustralia |
26-Jun-08 |
2008 No. 3 |
6, 10
|
1-Jul-08 |
21 |
ERC0039 |
|
Central Dispatch and Integration of Wind and Other Intermittent Generation |
NEMMCO |
1-May-08 |
2008 No. 2 |
2, 3, 4, 5, 8, 10, 11
|
1-May-08 31/03/2009 |
20 |
ERC0043 |
|
Integration of NEM Metrology Requirements |
NEMMCO |
6-Mar-08 |
2008 No. 1 |
7, 8, 9, 10, 11
|
6-Mar-08 |
19 |
ERC0045 |
|
Process for Region Change (formerly called Region Boundaries) |
MCE |
20-Dec-07 |
2007 No. 11 |
3, 8, 10, 11
|
1-Jul-08 |
21 |
ERC0005 |
|
Registration of Foreign Based Persons and Corporations as Trader Class Participants |
BP Energy Asia |
20-Dec-07 |
2007 No. 10 |
2, 3, 11
|
1-Jan-08 |
18 |
ERC0044 |
|
Congestion Pricing and Negative Residue Management Arrangements for the Snowy Region |
Hydro Tasmania, International Power, LYMMCO, NRG Flinders, TRUenergy |
8-Nov-07 |
|
|
Rule Not Made |
|
ERC0042 |
|
Split Snowy Region |
Macquarie Generation |
8-Nov-07 |
|
|
Rule Not Made |
|
ERC0041 |
|
Timing of System Restart Ancillary Services Testing |
NEMMCO |
25-Oct-07 |
2007 No. 9 |
3
|
25-Oct-07 |
17 |
ERC0048 |
|
Minor Changes 2007 |
AEMC |
11-Oct-07 |
2007 No. 8 |
1, 2, 3, 4, 5, 6, 7, 8
|
25-Oct-07 |
17 |
ERC0054 |
|
Abolition of Snowy Region |
Snowy Hydro Limited |
30-Aug-07 |
2007 No. 7 |
3, 10, 11
|
30-Aug-07 |
16 |
ERC0016 |
|
Efficient Dispatch of Regulation Services |
Hydro Tasmania |
23-Aug-07 |
2007 No. 6 |
3, 10, 11
|
1-Jan-09 |
24 |
ERC0035 |
|
Cost Recovery of Localised Regulation Services |
NGF |
23-Aug-07 |
2007 No. 5 |
3, 11
|
1-Jan-09 |
24 |
ERC0032 |
|
Dispatch of Scheduled Network Services |
Hydro Tasmania |
16-Aug-07 |
|
|
Rule Not Made |
|
ERC0037 |
|
NEMMCO Participant Derogation (Deferral of Settlement Payments due to APEC) |
NEMMCO |
16-Aug-07 |
2007 No. 4 |
|
16-Aug-07 |
15 |
ERC0046 |
|
Transmission Last Resort Planning Guidelines |
AEMC |
10-Jul-07 |
|
|
Final decision made and Guideline published |
|
ERC0040 |
|
Obligations of Network Service Providers - Connection Applications |
Energy Solutions Australia |
26-Apr-07 |
|
|
Rule Not Made |
|
ERC0029 |
|
Alternative Snowy Region Boundary (Discontinued) |
Macquarie Generation |
22-Mar-07 |
|
|
Not to proceed with proposal |
|
ERC0084 |
|
Transmission Last Resort Planning |
MCE |
8-Mar-07 |
2007 No. 3 |
5, 10
|
15-Mar-07 |
13 |
ERC0004 |
|
Technical Standards for Wind Generation and Other Generator Connections |
NEMMCO |
8-Mar-07 |
2007 No. 2 |
2, 3, 4, 5, 7, 8, 9, 10, 11
|
15-Mar-07 |
13 |
ERC0022 |
|
Transmission network replacement and reconfiguration |
Stanwell Corporation Limited |
1-Mar-07 |
|
|
Rule Not Made |
|
ERC0028 |
|
Reallocations |
NEMMCO |
15-Feb-07 |
2007 No. 1 |
2, 3, 8, 10, 11
|
31-May-07 |
14 |
ERC0020 |
|
Pricing of Prescribed Transmission Services |
AEMC |
21-Dec-06 |
2006 No. 22 |
5, 6, 8, 9, 10, 11
|
28-Dec-06 |
12 |
ERC0015 |
|
Resolution of existing generator performance standards |
NGF |
7-Dec-06 |
2006 No. 21 |
4, 5, 10
|
7-Dec-06 |
12 |
ERC0033 |
|
NEMMCO Participant Derogation (Extension of Cost Recovery of Regulation Services in Tasmania) |
NEMMCO |
7-Dec-06 |
2006 No. 20 |
|
7-Dec-06 |
12 |
ERC0034 |
|
Reform of the Regulatory Test Principles |
MCE |
30-Nov-06 |
2006 No. 19 |
5, 10, 11
|
30-Nov-06 |
11 |
ERC0002 |
|
Economic Regulation of Transmission Services |
AEMC |
16-Nov-06 |
2006 No. 18 |
1, 2, 5, 7, 8, 9, 10, 11
|
16-Nov-06 |
10 |
ERC0001 |
|
Management of negative settlement residues by re-orientation |
Snowy Hydro Limited |
9-Nov-06 |
|
|
Rule Not Made |
|
ERC0027 |
|
Metrology |
NEMMCO |
9-Nov-06 |
2006 No. 17 |
7, 9, 10, 11
|
9-Nov-06 |
10 |
ERC0024 |
|
Studland Bay Wind Farm Participant Derogations |
Woolnorth Studland Bay Pty Ltd |
19-Oct-06 |
2006 No. 15, 16 |
|
1-Nov-06 |
10 |
ERC0030 |
|
Management of negative settlement residues in the Snowy Region |
Hydro Tasmania, International Power, LYMMCO, NEMMCO, NRG Flinders, Southern Hydro |
14-Sep-06 |
2006 No. 14 |
|
1-Nov-06 |
10 |
ERC0007 |
|
TransGrid Participant Derogation (Treatment of Contingent Projects (Interim Arrangements) |
TransGrid |
27-Jul-06 |
2006 No. 13 |
|
27-Jul-06 |
9 |
ERC0012 |
|
Extension of Inter-regional Settlements Agreement |
Department of Infrastructure (Victoria) |
13-Jul-06 |
2006 No. 12 |
3
|
13-Jul-06 |
8 |
ERC0026 |
|
Inspection and Testing of Metering Installations |
EnergyAustralia |
29-Jun-06 |
2006 No. 11 |
|
1-Jul-06 |
7 |
ERC0025 |
|
Reform of dispute resolution process for the Regulatory Test |
MCE |
29-Jun-06 |
2006 No. 10 |
5, 8, 10, 11
|
1-Jul-06 |
7 |
ERC0003 |
|
Participation in SRA - EnergyAustralia Participant Derogation |
NEMMCO |
16-Jun-06 |
2006 No. 9 |
|
22-Jun-06 |
7 |
ERC0023 |
|
Advocacy Panel |
MCE |
15-Jun-06 |
2006 No. 8 |
2, 8, 10, 11
|
1-Jul-06 |
7 |
ERC0019 |
|
Reliability Safety Net Extension |
Reliability Panel |
11-May-06 |
2006 No. 7 |
3, 10
|
18-May-06 |
5 |
ERC0018 |
|
System restart ancillary service arrangements and pricing under market suspension |
NEMMCO |
20-Apr-06 |
2006 No. 6 |
3, 4, 8, 10, 11
|
20-Apr-06 |
4 |
ERC0011 |
|
Statement of Opportunities Update |
NEMMCO |
13-Apr-06 |
2006 No. 5 |
3, 5
|
20-Apr-06 |
4 |
ERC0017 |
|
Recovery of negative inter-regional settlements residue |
NEMMCO |
30-Mar-06 |
2006 No. 4 |
3, 11
|
1-Jul-06 |
7 |
ERC0008 |
|
Review of operating incidents |
NEMMCO |
2-Feb-06 |
2006 No. 3 |
4, 5, 8
|
2-Feb-06 |
3 |
ERC0014 |
|
Publication of Information for Non-scheduled Generation |
NEMMCO |
15-Dec-05 |
2006 No. 2 |
3, 10
|
12-Jan-06 01/07/2006 |
7 |
ERC0010 |
|
Revision to dispatch pricing due to manifestly incorrect inputs |
NEMMCO |
17-Nov-05 |
2006 No. 1 |
3, 10
|
1-Jun-06 |
6 |
ERC0009 |
|
Review of the Snowy regional boundary by Macquarie Generation |
Macquarie Generation |
|
|
|
Not to proceed with proposal |
|
ERC0006 |
|
Origin Energy Participant Derogation (Technical Requirements for Mount Stuart Power Station) |
Origin Energy |
|
|
|
Not to proceed with proposal |
|
ERC0036 |
|
Responsible Person Contestability |
Metropolis Metering Assets Pty Ltd |
|
|
|
Not to proceed with proposal |
|
ERC0038 |